Roof Replacement in the Third Ward from $9,500. New Jersey prices, and the access priced as the real line item it is in this city. Free inspection and a written quote.
The tightest frontages covered on this site. A continuous row means material and waste share a few feet of sidewalk, and the roof runs into the neighbor's at a party wall -- which has to be terminated properly at that junction rather than lapped over and hoped about.
An architectural asphalt roof in New Jersey runs $9,500 to $26,000, and on a typical 2,000 square foot house most people pay $12,000 to $18,000 installed. Those are state figures, and on a Passaic building they are the starting point rather than the answer.



Those are New Jersey figures for an architectural asphalt roof, and on a typical 2,000 square foot house most people pay $12,000 to $18,000 installed. In this city they are the starting point rather than the answer, because the route to the roof is a genuine part of the cost and it varies street by street. Expect the top of the range on an otherwise ordinary roof. Narrow frontages mean material and waste share a few feet of sidewalk, and a small roof that is mostly parapet has the worst possible ratio of detail to field.
Side access on the plot, somewhere to stand a dumpster without a street arrangement, a simple roof shape and a deck that turns out sound. In Wallington and parts of Passaic Park that is normal; in the Third Ward it is not.
A continuous row with a narrow frontage, so material and waste share a few feet of sidewalk. A route onto the roof that runs through a tenancy. A trading business below whose hours the work has to fit. And long parapet runs, because coping is detail work.
How decking replacement is priced. It belongs in the scope as a rate per sheet, because nobody knows how much has softened until the covering is off, and a lump figure is a guess in one direction or the other.
A densely built residential ward on the city's regular street grid, with Third Ward Memorial Park at its center.
Closely set two- to four-family housing, much of it attached, on narrow frontages.
The tightest access on this site. Narrow frontages and continuous rows mean material and waste share a few feet of sidewalk, and a roof that runs into the neighbor's at a party wall has to be terminated properly at that junction rather than simply lapped over it.
Two things move a Passaic price more than the covering does, and both are consequences of density rather than of roofing.
At 22,514 people per square mile the answer is rarely simple. No side yard, usually no driveway, and a dumpster that has to go on the street with an arrangement. Material up the frontage and waste down it is labor, and a quote that does not mention it has either absorbed it or not thought about it.
An attached building has no eaves. Water leaves through an internal outlet or a scupper cut through a parapet wall, so the failures are at the coping, the upstand and the outlet. A roof quote covering the field and silent on those has priced the easy part.
A blocked outlet ponds the roof instead of overflowing off an edge. Water standing in a lap through a cold week expands and lifts it, then thaws and runs in through the gap it just made. Outlet capacity is the cheapest genuine upgrade on a roof here.
On a narrow attached house the flat roof is small and almost entirely edge: parapet on two or three sides and an outlet.
EPDM is bonded with adhesive and tape rather than welded, so on a small roof that is mostly parapet upstands the workmanship at each termination is doing most of the work.
On a narrow attached house the pitched element is a small front slope with a parapet or a party wall on each side, and the flashing into those walls is the whole job.
Four-family buildings on narrow frontages are the hardest scheduling problem on this site.
Small commercial premises on a residential street bring a constraint the bigger jobs do not: neighbors.
No side yard, no driveway, parapets on every side.
Semi-detached and pitched. Eaves are back in play.
Mill-scale low slope, with plant on top of it.
The shop below decides the hours and the route.
Bus routes and loading bays. Arrange the street first.
A more open grid, so a dumpster needs no negotiation.
Detached houses, side access, sometimes no permit.
The questions that decide this job, answered up front.
Only where it has actually softened, and as a rate per sheet in the written scope rather than a lump guess. Nobody knows how much has gone until the covering is off, and on a dense attached building there is the extra question of how the waste gets down -- which is why it is stated rather than absorbed.
On the street in most of this city, which needs arranging rather than assuming, and the arrangement is frequently the longest lead time on the job. In Wallington and parts of Passaic Park it can sometimes go on the plot, and that is a genuine saving.
Rubber means EPDM, at $5 to $9 per square foot: bonded with adhesive and tape, black, and the least expensive single-ply. TPO is $6 to $12, welded at the seams and reflective, which matters on a large roof over occupied space. On a small rear addition EPDM is usually the right answer rather than the cheap one.
Usually yes here, and the reason is the building rather than the work. Ordinary maintenance under N.J.A.C. 5:23-2.7 covers a DETACHED one- or two-family dwelling, and in a city this dense very little housing is detached. Three or more units is never exempt. We confirm it at the survey either way.
Yes, and it is most of what we do on Main Avenue. It means working in bays, protecting from underneath as well as above, and fitting the hours the business can tolerate. All three are real labor and we price them openly rather than absorbing them and then arguing about it.
The route to the roof established before anything is priced. New Jersey figures, with the access stated rather than buried.