Shingle Roof Replacement in Armory Park from $4.50. Architectural at $5.50 to $8.00 a square foot -- and in this city it is usually only part of the roof. Free inspection and a written quote.
Where a house here has a genuine pitched roof it is usually straightforward: a simple shape, reachable, and a deck that is predictable for the era. If two quotes differ by thousands on one of these roofs, the difference is the shingle grade or the decking allowance rather than the building.
Architectural shingle installs at $5.50 to $8.00 per square foot in New Jersey and three-tab at $4.50 to $6.50. That gap is a few thousand dollars on an average roof and it is the clearest case of a cheaper quote being a lesser roof rather than a better price.



Three-tab installs at $4.50 to $6.50 per square foot in New Jersey and architectural at $5.50 to $8.00. The local complication is that a pitched slope in this city is frequently a street-facing section in front of a much larger flat roof, so 'the roof' is often two systems and two prices. Middle of the range, and the reason is simply that a dumpster can usually go on the frontage without a negotiation. The buildings are still attached, so the parapet and the outlet are still where the money should go.
A quote that prices the whole roof as shingle has not been up there. The pitch and the flat behind it fail on different clocks and need different products, and the transition between them is the detail that decides both.
Freeze and thaw drives water back up under the courses in the first three feet, which is what an ice barrier exists to stop. Its coverage is a measurable line on a scope. On a parapet roof there is no eaves at all, which is why this only applies in parts of the city.
Two coverings is the practical limit, so a cheap overlay price on a twice-covered roof is not a price. It takes two minutes to check at the rake edge.
Slightly easier access than the tightest parts of the city, which shows up in the labor on an otherwise identical roof. The buildings are still attached, so the parapet and the outlet are still where the trouble is -- but a dumpster can usually be placed without a negotiation.
Worth knowing before you start ringing round, because in this city the lead time is rarely about the crew.
On most jobs here the roofing is two to five days and the preparation is what takes the calendar. A dumpster on a city street, a delivery on a bus route, a route onto the roof through somebody else's tenancy, and hours that fit the business below all have to be arranged before a crew is any use. A contractor who quotes a start date without mentioning any of that is quoting an empty building.
A slightly more open grid than the Third Ward, which shows up in the labor on an otherwise identical roof: a dumpster can usually be placed without a negotiation.
Two- and three-family houses here typically have one flat roof over the whole building rather than a pitched front and a flat back.
A single flat roof over a two- or three-family house is close to the ideal EPDM job: one plane, few penetrations, a manageable area.
Three- and four-family buildings with a single flat roof over the whole footprint, which is the cleanest version of this work: one plane, one sequence, and a street that can take a dumpster.
Light commercial and workshop buildings among the housing, usually single-story with a straightforward low-slope roof.
No side yard, no driveway, parapets on every side.
Semi-detached and pitched. Eaves are back in play.
Mill-scale low slope, with plant on top of it.
The tightest frontages, and party-wall junctions.
The shop below decides the hours and the route.
Bus routes and loading bays. Arrange the street first.
Detached houses, side access, sometimes no permit.
The questions that decide this job, answered up front.
Two, properly. They are different systems with different lives and different prices, and a single figure for 'the roof' nearly always means one of them was estimated rather than priced. The transition between them is the detail that decides both.
Architectural on a building you intend to keep: $5.50 to $8.00 per square foot against $4.50 to $6.50, heavier, better in wind and longer-lived. Three-tab is defensible on a small front slope or a building being sold shortly.
Yes, and it is most of what we do on Main Avenue. It means working in bays, protecting from underneath as well as above, and fitting the hours the business can tolerate. All three are real labor and we price them openly rather than absorbing them and then arguing about it.
No. The inspection is free, the written quote is free, and neither carries an obligation. The survey covers the frontage and the route as well as the roof, which is the part most quotes skip and the part that decides the price here. What we will not do is give you a number at the curb.
Because getting to the roof costs more here. Passaic runs at 22,514 people per square mile -- 7th of New Jersey's 565 municipalities -- so there is no side yard, usually no driveway, and nowhere to stand a dumpster except the street. Material goes up the frontage and waste comes down it, and on a mixed-use building the route is through a tenancy.
The route to the roof established before anything is priced. New Jersey figures, with the access stated rather than buried.